Gold Coast Pool Construction

As swimming pool and spa specialists in the Gold Coast area, we know a thing or two about swimming pool construction. This is why when you get in touch with Casino Pools and Spas you can be assured of only the best service from start to finish.

We have been in the industry for 35 years now and because of our time in the industry within Australia we have established ourselves an authority figure.

Swimming pool construction really is something you want to leave to the professionals, even though you can most definitely dig up your own backyard and pop in a fiberglass pool you purchased somewhere  – or a plunge pool for that matter.

The reason we recommend getting a specialised team in is simply because there are many things that could potentially go wrong when you just take a spade and start digging. From burst water pipes to a ground that is not stable enough to be used for a swimming pool installation and so much more.

I AM READY FOR MY POOL – WHAT NOW?

The next steps you would take when you have decided a swimming pool is needed on your property is to get in touch with our team. They will discuss things with you such as what type of pool you want – fiberglass or concrete – estimated size of area available for installation, your budget among other things.

Once that is over, you will get one of our team members to come through to your property and assess the area. They will then make their recommendations and once you have both agreed how to proceed, the fun part starts.

Having a specialist team to do your swimming pool construction means you do not have much to do or worry about. We will take care of everything, and because Casino Pools and Spas is a family run business there will always be someone available to make sure the project is on track and that you are happy and comfortable with how your vision is coming to life.

SWIMMING POOL CONSTRUCTION 101

A few things to be aware of that will take place when our team arrives to start with the pool installation:

  1. The area will be cordoned off. It is a dangerous area once the excavation starts, so make sure you keep little ones clear of the area for the duration.
  2. Excavation of the designated area
  3. If you opted for a fiberglass pool, it will be pre cut off-site and once the ground is ready and prepared, the fiberglass pool will be brought to your property and installed. If you went with concrete, it will take a little longer and this type of pool is basically built on-site and installed.
  4. Once all is settled and ready your pool can be filled. This can also take some time
  5. Put treatment in the pool
  6. Dive in and enjoy.

NOT DECIDED ON A WATER SYSTEM YET?

Ask our Casino Pools and Spas about our Pristine Freshwater System. It will be so much safer for your pool, your family and the environment.

NO TIME LIKE THE PRESENT

Get in touch today and be prepared to be swimming in your own pool in no time. Our team members are standing by to assist you to make the most informed decision.

Find us here.

Gold Coast’s Leading Pool Construction Services

DO YOU HAVE A POOL REQUIREMENT WE CAN HELP WITH?